Project Info
Major Projects, U-stamp Test Separator For Well Head Platform Project
Description
PROJECT
Anglo Eastern 25, Major Projects, U-stamp Test Separator For Well Head Platform Project, Zhdanov-b Project, Turmenistan
CLIENT
ILK Construction / Dragon Oil
SCOPE
Mech Design, Engg Drawings, Material Procurement, Fabrication, Testing, Painting
Thickness: 50mm Shell, Test Pressure: 99.5 Bar
Length: 5000 Mm, Diameter: 1700 Mm
Weight: 20 Ton
EXECUTION TIME PERIOD
12 Weeks