![18.png](https://ssemiratespetroleum.com/wp-content/uploads/2023/09/18.png)
Project Info
Mud System - Chevron Project, Iraq Kurdistan 45 Cu Ft. Sile / Hopper Piping/Jet Shear Skid
Description
PROJECT
Mud System – Chevron Project, Iraq Kurdistan 45 Cu Ft. Sile / Hopper Piping/Jet Shear Skid
CLIENT
PETROCHEM/CHEVRONT
SCOPE
Engineering Drawings, Material, Procurement, Fabrication, Testing, And Painting.
Total Weight: 60 Tons
EXECUTION TIME PERIOD
8 Weeks